"The largest improvement that I see is being able to monitor power usage in our lab and making sure that our PDUs don’t get overloaded. We’ve gone through a few retirement phases and we can track that with the graphs in PIQ — we see the power usage going down. Being able to see the temperature throughout our lab is also pivotal."

Kiel Anderson | Senior Lab Network Engineer - F5

Case Studies

Pages